Planning near you · Mayo · Ref 2660425
The development will consist of removals, modifications and extensions to the…
Cloggernagh East , Islandeady , Castlebar
Permission granted with conditions
Council decision recorded: July 20, 2026
- Applicant
- The Board of Management
- Proposed use
- See council description
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
- Application received
Source: NPAD
NPAD · source SHA-256:
8e46bc0beeda56b2· field: ReceivedDatee8cec740460fff43 77fee8911614019b ebad52ef77b1ca4f - Council decisionGranted with conditions
Source: NPAD
NPAD · source SHA-256:
8e46bc0beeda56b2· field: DecisionDatee8cec740460fff43 77fee8911614019b ebad52ef77b1ca4f - Grant recorded
Source: NPAD
NPAD · source SHA-256:
8e46bc0beeda56b2· field: GrantDatee8cec740460fff43 77fee8911614019b ebad52ef77b1ca4f
What changed
Updated in the retained record: Source status, Council outcome, Council decision.
Compare the previous and updated values
Source status: Decided... → DECISION MADE; Council outcome: Decided... → CONDITIONAL; Council decision: not supplied → 2026-07-20
Legacy batch date (exact collection time unavailable): 22 July 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns Cloggernagh East , Islandeady , Castlebar. Proposal excerpt: “The development will consist of removals, modifications and extensions to the existing school including a new single storey extension to the south and a new entrance portal at the front north elevation along with a new o…”
Sources disagree on some fields. The latest reported value is shown; differences require review.
Location & nearby applications
Cloggernagh East , Islandeady , Castlebar
The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.
Nearby applications
Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.
- Planning permission for 1.The installation and construction of two number standalone, waterless wheelchair-accessible eco-toi…
- Planning permission to construct a new dwelling house, and wastewater treatment system, domestic garage, and all associated s…
- Planning application for dwelling house, domestic shed, domestic wastewater treatment system and all ancillary siteworks and…
- retention permission for: 1. Domestic garage, 2. Airing shelter, 3. Alterations to the existing house, consisting of the rete…
- retain existing pre-school portacabin along with existing toilets as located on site
Documents & sources
Mayo County Council · Reference 2660425
View council file →- Acknowledgement / Validation Letter
- Application Form - Part A
- Archaeology Report
- Drawings - General
- Drawings - General
- Drawings - General
- Elevations
- Elevations
- Elevations
- Elevations
- Final Grant
- Floor Plans
- Floor Plans
- Newspaper Notice
- Notification of Decision
- Notification of Decision Letter to third parties
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Report Received from External Body
- Report Received from External Body
- Report Received from Internal Staff
- Report Received from Internal Staff
- Report Request Letter to External Body
- Sections
- Sections
- Sections
- Sections
- Site assessment report
- Site layout plan
- Site location map
- Site location map
- Site location map
- Site Notice
- Submission Acknowledgment
- Validation Check List
Source records and verification details
Change record: ePlan · legacy batch; original response hash unavailable
Proposal: NPAD · source SHA-256: 8e46bc0beeda56b2
Latest source observation retained: 2026-09-30T08:14:04.741260+00:00. Source dataset date: 2026-09-29.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-06-10
- Source status: PRE-VALIDATION → NEW APPLICATION
- decision due date: → 2026-07-22
- 2026-07-20
- Source status: NEW APPLICATION → Decided...
- Council outcome: → Decided...
- 2026-07-22
- Source status: Decided... → DECISION MADE
- Council outcome: Decided... → CONDITIONAL
- Council decision: → 2026-07-20
Source differences
- Source status: {"ePlan": "DECISION MADE", "NPAD": "APPLICATION FINALISED"}
- Proposal description: {"ePlan": "The development will consist of removals, modifications and extensions to the existing school includ...", "NPAD": "The development will consist of removals, modifications and extensions to the existing school including a new single storey extension to the south and a new entrance portal at the front north elevation along with a new on-site wastewater treatment system, modifications to drop off area and widening of vehicle entrance to the R309 roadside, provision of additional parking, play areas and associated site works."}
- Site address: {"ePlan": "Cloggernagh East Islandeady Castlebar F23HX85", "NPAD": "Cloggernagh East , Islandeady , Castlebar"}
- detail_url: {"ePlan": "https://www.eplanning.ie/MayoCC/AppFileRefDetails/2660425/0", "NPAD": "http://www.eplanning.ie/MayoCC/AppFileRefDetails/2660425/0"}
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.